2010
- Cornwall Council funding withdrawn
2011
- Friends of Bude Sea Pool (FoBSP) formed and charitable status achieved
2012
- FoBSP awarded a £50k start-up grant by Cornwall Council to take over management of Bude Sea Pool
- Emergency repairs to steps completed
- Beach Huts Phase 1: installation and leasing
2013
- Repairs made to damaged outer South wall of the Pool
- 30,000 tonnes of sand and rocks removed
- New sluice-gate and bridge installed
- Electricity and mains water connection
2014
- Middle outer wall repaired
- Improved walkway cut through Coach Rock
- New stainless steel railings by donation
2015
- North outer wall repaired
- Beach Huts Phase 2: further huts installed by personal donation
- Renewal of access steps
- Approval for the construction of the Hub granted
2016
- The Hub opened (changing rooms, office, store, community room)
2017
- Further repairs to sea wall
- FoBSP Office and Shop converted from redundant Council building
2020
- Re-concreting and re-nosing of 1st terrace platform
- Sluice gate repaired after serious storm damages
- Defibrillator installed
2021
- New steps for Middle Beach entrance
- New stainless steel fencing to reduce impact of rock fall by cliff face
2018
- Repair and refurbishment of stainless steel railings
- Installation of steps into the Pool by Coach Rock by personal donation
2019
- Renewal of Cornish granite steps to Summerleaze Beach thanks to the ‘Save our Steps’ campaign
- Installation of new roof covering for the Hub
2022
- Replacement of Beach Hut 3 that was destroyed by Storm Eunice
- Trial outdoor changing hut erected on upper terrace